Exposure against the published cap
Emissions versus the occupancy coefficient for 2024–2029 and 2030–2034. Penalty math is $268 per metric ton over the cap — nothing else.
The stack
Three layers, stacked on purpose. First we run Local Law 97 as software. Then, where the rooms justify it, we fund a battery and electrification package under a 0-CAPEX energy services agreement. Then we aggregate those batteries into a virtual power plant.
We become the system of record, then fund the kit, then put the building on eligible grid programs. Estimates only — we do not quote grid dollars here.
01 · Compliance
Priced at about $0.03 per GSF per year, with a $2,400 floor. The deliverable is an owner file, not a slide.
Emissions versus the occupancy coefficient for 2024–2029 and 2030–2034. Penalty math is $268 per metric ton over the cap — nothing else.
Which tons are operations, which are host-funded retrofit, and which belong inside a Power ESA. Article 320 caps are the surface.
May 1 annual report. 60-day grace to June 30. Miss-file is $0.50/sf/month — tracked as its own line, not mixed into the emissions penalty.
A file that can sit next to the asset model. Commercial copy may use NOI and cap rate, and we label those figures as examples.
02 · Power
Working split: 50/50 of verified bill savings and verified LL97 penalty reduction — measured from the building’s LL97 filing — until capital is recovered, then 30 BLD Power / 70 host. We never promise a reduction. Indoor Li-ion is generally 400 kWh per Fire Code control area. A battery alone does not reduce LL97 reported emissions; electrification does. The battery makes that affordable by absorbing peak demand.
Capital
BLD Power funds design, kit, and interconnection work that clears FDNY and DOB. The offer is binding only after a site walk.
Rooms
Zombie floors, basement electrical, unused service rooms. Generally 400 kWh per Fire Code control area — the walk counts rooms, not roofs.
Split
Share of verified bill savings and verified LL97 penalty reduction from the filing. Fifty-fifty until capital is recovered; then 30 BLD Power / 70 host. Not a promised reduction.
03 · The grid
We aggregate participating batteries so each building can earn from bills, fines, and the grid. Eligible programs include Value Stack and Con Edison demand response. Estimates only — this site does not publish specific grid-revenue figures.
Not in this company
Urban Energy was a Brooklyn solar installer that folded in 2025. Hardware, not an LL97 operating system. Different company. We do not pick that fight; we just say what we are.
No REC desk. No crypto. No tokenized attribute in v1. The product is a compliance file, an energy services agreement, and eligible grid programs.
No “FDNY-approved builder” badge. Storage needs FDNY and DOB on the specific room. That is the work, not a logo row.
48-hour first pass
Feasibility is a 48-hour first pass — coverage, $268/ton exposure, and whether an ESA is in scope. It is not a guarantee of penalty elimination.