Public demo
A sample ledger so $268 a ton is not abstract.
Two fictional covered buildings — a Midtown office and an Upper East Side market-rate co-op. Same statute, different language. No login.
Public demo · read-only · no login
Covered building
Midtown East office — sample
418 Lexington Avenue · Manhattan
- BBL
- 1-01315-0024
- Occupancy
- Group B office, single tax lot
- GSF
- 280,000
- Reported emissions
- 2,576.0 tCO₂e
- Intensity
- 0.00920 tCO₂e/sf
Illustrative covered office. Not a real customer. Coefficients are the published LL97 Group B limits.
Emissions versus cap
The $268/ton arithmetic
$268 × tons over cap
2024–2029
207.2 t over · $55,530
2030–2034 cliff
1,307.6 t over · $350,437
First-period penalty
$55,530
207.2 t × $268
2030 penalty if unchanged
$350,437
1,307.6 t × $268
Compliance OS
$8,400
$0.03 / GSF / year
Commercial illustration · not an appraisal
Treat the 2030 overage of $350,437 as stabilized NOI at a 5.5% cap rate and the implied value is $6,371,578. Example only. Not a guarantee the penalty is eliminated.
Filing status
May 1, then sixty days
- Last report2024 report filed 30 Apr 2025
- Next due2025 report due 1 May 2026
- Grace60-day grace to 30 Jun 2026
- StatusIn preparation
Miss-file on this GSF is $140,000 per month at $0.50/sf — a separate clock from the $268/ton emissions penalty.
Recommended measures
What the OS puts on the page
01 · Close the 2024–2029 gap first
ComplianceThe building is only ~207 t over the first-period cap. Lighting, controls, and operating hours are the cheap tons.
02 · Plan the 2030 cliff as a capital event
PowerSame emissions against the 2030 cap is a ~$350k annual overage. That is the Power conversation — not a one-year retrofit punch list.
03 · Turn the vacant third-floor plate into storage
PowerIndoor Li-ion is generally 400 kWh per Fire Code control area. Zombie floor and electrical rooms are the site, not the roof.
04 · Peak-shave against the Con Edison account
PowerVerified avoided overage is one stack. Demand and grid services are the other. Both sit inside the ESA.
05 · Do not miss the file
FilingMay 1 annual report, grace to June 30. Miss-file is $0.50/sf/month — on 280,000 GSF that is $140,000 a month before any emissions penalty.
48-hour first pass
Your building is not this sample.
Request feasibility with the real address. Forty-eight hours to a first pass. Estimates only; FDNY and DOB still govern storage.