48-hour feasibility
Coverage test, occupancy coefficients, and $268/ton exposure for 2024–2029 and the 2030 cliff. You get a written first pass — estimates only — and a clear no if Power is not in scope.
The motion
We do not sell a storage system off a PDF. Compliance can start from the file. Power only becomes a binding 0-CAPEX offer after we have seen the rooms.
Coverage test, occupancy coefficients, and $268/ton exposure for 2024–2029 and the 2030 cliff. You get a written first pass — estimates only — and a clear no if Power is not in scope.
We count control areas, not brochures. Indoor Li-ion is generally 400 kWh per Fire Code control area. The walk is where zombie floors and basement electrical either become inventory or take Power off the table.
Compliance can start as an annual subscription and an owner file. Power, if offered, is a binding 0-CAPEX ESA — 50/50 until recovery, then 30/70. Host CAPEX stays at zero. Eligible grid programs can sit on the same battery.
Then the grid
Once a battery is live, eligible New York programs — Value Stack and Con Edison demand response among them — can sit on the same kit. Estimates only. We do not quote grid dollars on this site. A battery alone does not reduce LL97 reported emissions; electrification does.
What we need from you
48-hour first pass
Submit the building. You get a reference number and a 48-hour first pass. No login. The authenticated product is phase 2.